18-19 June 2025
Porterbrook’s Long Marston Rail Innovation Centre

Gripple

Stand: B8
Overhead Line Equipment

Meet the Game Changers in Rail Electrification!

Gripple is redefining rail electrification with innovative, tool-free solutions that streamline overhead line installation and reduce whole-life costs.

Since launching the SwiftLine Rail Dropper in 2023, Gripple has become a trusted partner to Network Rail and contractors, delivering products that improve safety, speed, and sustainability.

Backed by over 30 years of engineering excellence and world-class UK manufacturing, Gripple works closely with industry stakeholders to tackle the challenges of electrification and accelerate the transition to greener rail networks.

Head over to stand B8 to see Gripple's latest game-changing innovations for overhead line electrification. You've got to see it to believe it!

Address

Gripple
The Old West Gun Works
Savile Street East
Sheffield
South Yorkshire
S4 7UQ
United Kingdom
Network Rail Approves Gripple’s SwiftLine Rail Jumper as Latest Innovation in Rail Electrification
Following the successful launch of its SwiftLine Rail Dropper in 2023, Gripple, the leading manufacturer of electrical suspension and catenary systems, has announced Network Rail has approved its late …
1 Results
    SwiftLine Rail Jumper Clamp
    Install faster, work safer, and deliver up to 4x longer lasting jumper cables with our SwiftLine Rail Jumper clamps, designed for easy install and best in class cable protection.
    SwiftLine Rail Dropper
    Install faster, work safer and get more done in each possession window using our SwiftLine Rail Dropper. Developed working with OLE engineers and contractors.
    2 Results
      Gripple Company Overview
      At Gripple, we're more than just pioneers in manufacturing wire joining, tensioning devices, and wire suspension systems – we're innovators on a mission.
      Install twice as fast with the Gripple’s SwiftLine Rail Jumper
      In this short video an experienced Network Rail OLE engineer installs our SwiftLine Rail Jumper and a traditional OLE Parallel Groove Clamp. Can you guess which is faster?
      Four OLE rail droppers installed in just 1 min, 23 seconds!
      In this short video an experienced Network Rail OLE engineer installs four SwiftLine Rail Droppers back to back in just 1 minute 23 seconds.
      3 Results
        Loading

        Contact Exhibitor

        Exhibit with us!

        All aboard the sponsorship express!

        Steer your brand to success at Rail Live 2025—your next stop is recognition! Display your latest innovations and services in an immersive environment to 7,000 visitors.