17-18 June 2026
Porterbrook’s Long Marston Rail Innovation Centre
28 Mar 2025

Stage V Generator

Wernick Group Stand: A11
  • Robust and secure canopy with large lockable doors for added security in vulnerable areas
  • Large 24-hour fuel tanks that meet DEFRA compliance standards, allowing for greater running times between refuels
  • Industry-leading fuel consumption using advanced engine technology
  • Durable bunded base with 110% capacity to minimise environmental risks, complete with a high-level alarm
  • Full synchronisation, load share, and load demand capabilities
  • Road towable options for added flexibility
  • Connectivity to location tracking and full telemetry
  • Generator range available in sizes from 6kVA to 800kVA
Loading