12 Mar 2025
Signal Bases
)
)
Our range of signal bases are constructed off-site enabling consistency of product, savings on resource and materials and enabling less time needing to be spent by trackside installation teams – all whilst achieving up to 61% reduction in materials eC02, compared to original mix in A1-A3 GWP - Fossil, then this would be a 60% reduction. Based on new mix used from January 2023